Editing Glasgow and South Western Railway

Jump to: navigation, search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 125: Line 125:
 
The traffic congestion problem was also experienced on the main line between Elderslie and Dalry (where the Kilmarnock line diverged) and the decision was taken to duplicate this section of the route by a new line on the north of the lochs in the Garnock Valley. The scheme upgraded the Johnstone North line, and ran from its terminus (upgraded and relocated) to Brownhill Junction, north of Dalry, by way of Lochwinnoch. This was the Dalry and North Johnstone Line, which opened in 1905. The capacity relief was continued at Dalry by quadrupling the track from Brownhill Junction, and the junction itself was a flying junction, the first in Scotland.  
 
The traffic congestion problem was also experienced on the main line between Elderslie and Dalry (where the Kilmarnock line diverged) and the decision was taken to duplicate this section of the route by a new line on the north of the lochs in the Garnock Valley. The scheme upgraded the Johnstone North line, and ran from its terminus (upgraded and relocated) to Brownhill Junction, north of Dalry, by way of Lochwinnoch. This was the Dalry and North Johnstone Line, which opened in 1905. The capacity relief was continued at Dalry by quadrupling the track from Brownhill Junction, and the junction itself was a flying junction, the first in Scotland.  
  
Much more traffic took the diverging route at Elderslie towards Cart Junction—all of the new line traffic, as well as the fast Greenock boat trains—and the opportunity was taken to provide a burrowing junction at Elderslie for this route: when the Ayr main line was built, it crossed the canal by a bridge. The canal was long defunct, and a new line was built passing under the bridge and running to Cart Junction, eliminating the conflicting move. This opened in 1906.
+
Much more traffic took the diverging route at Elderslie towards Cart Junction—all of the new line traffic, as well as the fast Greenock boat trains—and the opportunity was taken to provide a burrowing junction at Elderslie for this route: when the Ayr main line was built, it crossed the canal by a bridge. The canal was long defunct, and a new line was built passing under the bridge and running to Cart Junction, eliminating the conflicting move. This opened in 1906.<ref name = ross/><ref name = sls/>
  
 
===Darvel===
 
===Darvel===

Please note that all contributions to All About Ayrshire may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see All About Ayrshire:Copyrights for details). Do not submit copyrighted work without permission!

Cancel Editing help (opens in new window)