Editing Glasgow and South Western Railway

Jump to: navigation, search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 16: Line 16:
 
Much of the network remains active at the present day; Glasgow commuting particularly has developed, and parts of the network have been electrified. Many of the earlier mineral workings, and branches constructed to serve them, have ceased, and many local passenger stations in rural areas have closed.  
 
Much of the network remains active at the present day; Glasgow commuting particularly has developed, and parts of the network have been electrified. Many of the earlier mineral workings, and branches constructed to serve them, have ceased, and many local passenger stations in rural areas have closed.  
  
In 1921 the G&SWR had of line (calculated as single track extent plus sidings) and the company’s capital was about £19 million.
+
In 1921 the G&SWR had {{convert|1128|mi}} of line (calculated as single track extent plus sidings) and the company’s capital was about £19 million.
  
 
==History==
 
==History==

Please note that all contributions to All About Ayrshire may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see All About Ayrshire:Copyrights for details). Do not submit copyrighted work without permission!

Cancel Editing help (opens in new window)